Use this page to view the status of the selected assignment.
The Assignment Status page displays the selected assignment name and description. The Operations table lists the following details:
| Table Elements | Description |
|---|---|
| Target | List of targets that have been selected for the provisioning assignment. |
| Operation Type | Displays the provisioning status for each host. From the time the assignment is created till it has been successfully completed (provisioned), the hosts go through various stages (for example, Assign, Ready, Schedule, Stage, Reboot, etc., till they are in the Provisioned state.) A row will be added to the host every time it moves from one state to another. For example, when you submit an assignment for a host, this page displays just one row with the operations status reading "Assign." When the assign job is complete and the host moves into the "Ready" state, another row will be added to this table, displaying the new status along with the previous one. |
| Job ID | Displays the job ID for each operation status. Click the required job ID link to go to the Jobs page, and view the details for that job. |
| Fraction Complete | Displays the progress of each operational stage. |
| Last Update Time | Displays the date and time when the assignment was last modified. |
Related Topics
Configuring the Software Library
Enterprise Manager Information Roadmap
Copyright © 1996, 2007, Oracle. All rights reserved.